|
INDUSTRIAL ABSEILING AND
ACCESS/RIGGING SOLUTIONS
|
|

|
 |
|
 |
|
 |
|
|
Welwyn Church, Hertfordshire
To take down and re-install a clock face
using a rope pulley system and abseilers.
|
|
Gross Fine -
Sufference Walk London
Plant removal to prevent
damage to wharf wall. Carried out at low tide.
|
|
Bancourt Construction
Construction of an eight
storey air conditioning tubing and boiler flu system.
Work involved fixing brackets to wall and riveting /
masticing tube lengths.
|
|
|